I made the bottom pan, which extends from the aft exhaust tunnel to Sta. C; it requres a bend on each side from the exhaust tunnel to the stringers, and attaches to the kick panels. Stiffeners are required to wrap the fabric and create a junction between the fabric and sheet metal on both the bottom pan and kick panels, which were also made.