Located the oil sending unit with a 1/8" NPT elbow. Polished and cleaned the internal surfaces of all the 1/4" alum. oil lines, then torque striped upon final assembly. Safety wired all fittings on the fuel controller. Fabricated an alum. bracket to provide an origin for throttle spring.