KitLog pro

Powered By Kitlog Pro v2.0

JOHN'S WEB SITE
' style=
Date:  10-26-2012
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Quick drains

Installed Saf-Air drain valves in both bottom tanks. Secured main fuel line to turbine with cushioned clamps.
' style=

Saf-Air drain valve

Saf-Air drain valve

' style=

Fuel line secured

Fuel line secured

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.