KitLog pro

Powered By Kitlog Pro v2.0

Johns Web Site
' style=
Date:  9-6-2014
Number of Hours:  28.00
Manual Reference:  
Brief Description:  spar

Spar work:

All boards run though drum sander with 80grit paper. Then first and second laminations require skarfing boards together to get needed length. West system epoxy used. Each board to be glued was wet out and then a thicken coat with 404 microfiber then clamped for 72 Hours.

Using 24' long 2x4 box steel for clamping table on wood frame built last yr. My hope is that the steel helps spread out clamp pressure and prevent grain damage from clamps while maintaining striaght flat surface.

9/12 Third ply clamped. Used West 209 extra slow epoxy. About 3 pumps is right amount to wet out. Took about 14 pumps and 14 scoopes of 404.

9/13 Shop clean up while waiting on epoxy.

9/15 Forth lamination.

9/19 Fifth lamination.

9/22 Sixth lamination.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.