12/15/13 Started construction of fiberglass wing tanks by making model of hollow wing to define space. 12/16/13 Started fiberglassing parts 12/18/13 1Hr fiberglassing 12/18/13 Put way to much epoxy on to cover cloth, air bubble everywhere, 1Hr sanding 12/19/13 1.5 Hrs sanding and planing internal baffles 12/20/13 Sanding and assembly of inboard and outboard sides 12/22/13 Tried to assemble front and back, put epoxy on, could get it clamped so it would stay together, wiped epoxy off, just put back on. 12/23/13 Installed baffles 12/24/13 Installed front 12/25/13 Installed sump and fuel line hardware