Powered By Kitlog Pro v2.0
JOHN'S WEB SITE
V-Twin
All
6-20-2019
< Previous Log Entry
Next Log Entry >
Date:
6-20-2019
Number of Hours:
3.00
Manual Reference:
Brief Description:
Over center linkage
Reinstalled over center linkage and worked on loosening it up. The two ear legs were installed at factory with slightly different angles which creates a bind at some points in the range of the gear raising and lowering.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
V-Twin Home
Category
# Logs
# Hours
All
732
2876
Canard
43
153
Controls
39
98
Electrical
71
394
Engine
169
624
Fuel system
23
62
Fuselage
248
1073
Landing gear
69
252
Miscellaneous
9
28
None
1
6
Preparation
3
15
Wings
57
171
Copyright © 2001-2024 Matronics. All Rights Reserved.