Started with the gear leg and wheel fairings. Had to trim the front wheel fairings 1/8" further than the scribe line. Left fairing almost ready. Started the nose gear leg fairing and nose gear fairing. Installed nutplates for the nose fairing. Installed nuts for the tow bar.