32-19 step 5 Removed the flaperon torque arms and the torque tubes from the fuselage. 32-10 step 8 Final drilled #12 the holes in the flaperon torque tubes. 32-10 step 9 Reinstalled all parts. 32-11 step 5 Routed the rudder cables through the aft bulkhead and safetywired the platic sleeves.