KitLog pro

Powered By Kitlog Pro v2.0

RV-12
' style=
Date:  2-16-2010
Number of Hours:  2.00
Manual Reference:  21
Brief Description:  21 - Mid Fuse Ribs

Continued chapter 21.
Riveting the step ribs.
Riveting the right fuselage corner skins.
Installed snap bushings.
Installed the fuel bulkhead fitting in the F-1204D center section bulkhead (28-06 step1).

After installing the SB500-6 snap bushings I took the dremel to make the bushings wider to accept the fuel line.
' style=

21-14 step 4

21-14 step 4

' style=

21-15 step 3

21-15 step 3

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.