KitLog pro

Powered By Kitlog Pro v2.0

RV-12
' style=
Date:  9-14-2009
Number of Hours:  3.00
Manual Reference:  13
Brief Description:  13 - Spar Assembly

Finally back in the barn.
Kids back to school so have some time again.

13-02 All Steps
13-03 Step 3

Separated and deburred the attach angles.
Matched drilled the left rib doubler.
Drilled and tapped the AEX tie downs.
' style=

Attach angles

Attach angles

' style=

AEX tie down

AEX tie down

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.