06-05 Radius the edges, deburring VS ribs, fluting the ribs (rivitting after priming) 06-06 Removed material from VS-1201 and VS-1204 with a green snipe, filed the edge, final drilled and dimpled the nutplate holes. Skipped to dimple the nutplates. 06-07 Will be done after priming