KitLog pro

Powered By Kitlog Pro v2.0

RV-12
' style=
Date:  10-13-2010
Number of Hours:  4.00
Manual Reference:  32
Brief Description:  32 - Flight Controls

32-19 step 5 Removed the flaperon torque arms and the torque tubes from the fuselage.
32-10 step 8 Final drilled #12 the holes in the flaperon torque tubes.
32-10 step 9 Reinstalled all parts.
32-11 step 5 Routed the rudder cables through the aft bulkhead and safetywired the platic sleeves.

Besides that did some duburring and priming.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.