31-06 : I still had to rivet the armrests. That gave me the oppertunity to install the reed switches and snap bushings first. 31-02 step 6 : Made the firewall grommet, you have to apply quite some pressure before the grommet shears. Used a 1/2" socket. 31-03 step 3 : Installed the wire conduit 31-03 step 5 & 6 : Routed the anttena and ELT wires. 31-04 step 6 : Installed the ES CPU Fans. Started to route the tunnel harnes