KitLog pro

Powered By Kitlog Pro v2.0

RV-12
' style=
Date:  4-23-2010
Number of Hours:  4.00
Manual Reference:  29
Brief Description:  29 - Fwd Upper Fuse

Page 29-04: Installing nutplates to the panel base.

Page 29-06:
Made the right part of the instrument panel/map box. Used solid rivets instead of the CCR rivets. The lowerside of the map box door needs to be trimmed 1/16' otherwise the door will not open 90 degrees (is easier to drill the rivetline of the mapbox door 1/16 lower than on the drawing).
Taped the hinge to the door and to the lower map box half to matchdrill the holes in both parts.
Used the step drill to drill the 7/16' hole
I misdrilled one of the holes for the camloc receptacle. The ears of the camloc are now not complety horizontal with the door closed.
' style=

Map box door

Map box door

' style=

Map box

Map box

' style=

Page 29-04

Page 29-04

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.