KitLog pro

Powered By Kitlog Pro v2.0

JOE'S WEB SITE
' style=
Date:  10-29-2016
Number of Hours:  4.00
Manual Reference:  
Brief Description:  ADS-B Out Installation #2

1. Removed Power Outlet
2. Removed GPS and Panel Mount
3. Removed Battery Switch
4. Drill hole for hole punch. Unfortunately even though I said several times, "measure twice cut once", I mismeasued the hole 10 mm off center. Not a functional problem but I will always be able to see it.
5. Punch 2 1/4 inch hole for control head
6. Mount control head.
' style=

Instrument Panel with items removed

Instrument Panel with items removed

' style=

Instrument Panel with ADS-B Control Head

Instrument Panel with ADS-B Control Head

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.