KitLog pro

Powered By Kitlog Pro v2.0

Joe & Steve's RV9A Project
' style=
Date:  2-28-2018
Number of Hours:  9.25
Manual Reference:  
Brief Description:  FWF plumbing

Finished installing and rigging throttle and mixture controls. Ran and test fit all fuel and oil lines. Found a few issues; the FI servo to spider line needed to be moved from its initial location due to interference with new throttle bracket, so now one end needs to be changed from 90 degree to 45 degree. Called Tom at TS Flightline, he said no prob changing the end so I shipped the hose back to him. Also need to order a different oil fitting as 90 degree oil filter adapter won't allow the one vans shipped to work. Everything else looking real good, other new hoses from TS fit perfectly. Drilled firewall holes for antisplat seperator and red cube. Glued sump heaters and sensor to oil sump.
' style=





' style=




' style=

heaters

heaters

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.