installed B&C battery cables and finalized high current wiring. Only big wires remaining are althernator and starter, need engine hung before ordering. New red cable solved the terminal stress issue, this is a real nice clean installation.
Ran a preliminary load budget on the vertical power website, looks like around 27a max, so 8 AWG plane power wire is recommended by VP and should be plenty.