Date:  9-15-2017
Number of Hours:  1.50
Manual Reference:  
Brief Description:  finalize high current wiring

installed B&C battery cables and finalized high current wiring. Only big wires remaining are althernator and starter, need engine hung before ordering. New red cable solved the terminal stress issue, this is a real nice clean installation.

Ran a preliminary load budget on the vertical power website, looks like around 27a max, so 8 AWG plane power wire is recommended by VP and should be plenty.