Powered By Kitlog Pro v2.0
Joe & Steve's RV9A Project
RV9A
Fiberglass
1-22-2018
< Previous Log Entry
Next Log Entry >
Date:
1-22-2018
Number of Hours:
5.50
Manual Reference:
Brief Description:
cowl and plenum
released and trimmed up plenum mold, turned out great. Now need to get tin work done to see what changes need to be made to the next iteration.
Sanded and filled cowl and nose gear glass, sprayed another 12 oz of high build.
original on left, copy on right
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
RV9A Home
Category
# Logs
# Hours
All
423
1684
Airframe assy/rig
26
95
Airframe Electrical
20
82
Canopy
36
164
Engine/FWF/Prop
28
150
Exterior Prime/Paint
34
148
Fiberglass
50
234
Fuselage
55
233
Hangar
20
Interior paint
16
50
Miscellaneous
37
102
Panel/Avionics
26
95
Prime/Paint
34
148
Upgrades
31
133
Wheels/Brakes/Fuel
10
50
Copyright © 2001-2024 Matronics. All Rights Reserved.