KitLog pro

Powered By Kitlog Pro v2.0

Joe & Steve's RV9A Project
' style=
Date:  8-24-2017
Number of Hours:  7.50
Manual Reference:  
Brief Description:  fuel line plumbing

fabricated and installed fuel lines from pump to firewall, also selector to L &R filters. Permanently installed and wired fuel pump. Finalized and insulated tunnel wiring. Fabricated firewall doubler; after much head scratching and staring at ambiguous drawings, decided on fuel line firewall penetration location with help from VAF. Drilled firewall and back-riveted doubler on.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.