Powered By Kitlog Pro v2.0
Joe & Steve's RV9A Project
RV9A
All
8-10-2017
< Previous Log Entry
Next Log Entry >
Date:
8-10-2017
Number of Hours:
0.00
Manual Reference:
Brief Description:
finish electrical, prep floor
finished conduit and electrical work, cleaned everything out and then hit the floor with my leaf blower followed by power spray. Then muriatic acid etch, power spray again and squeegie. Ready for epoxy tomorrow.
daddys helper
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
RV9A Home
Category
# Logs
# Hours
All
423
1684
Airframe assy/rig
26
95
Airframe Electrical
20
82
Canopy
36
164
Engine/FWF/Prop
28
150
Exterior Prime/Paint
34
148
Fiberglass
50
234
Fuselage
55
233
Hangar
20
Interior paint
16
50
Miscellaneous
37
102
Panel/Avionics
26
95
Prime/Paint
34
148
Upgrades
31
133
Wheels/Brakes/Fuel
10
50
Copyright © 2001-2024 Matronics. All Rights Reserved.