KitLog pro

Powered By Kitlog Pro v2.0

Johns Web Site
' style=
Date:  7-28-2015
Number of Hours:  4.00
Manual Reference:  Ch 2
Brief Description:  Fuselage Reinforcement Doilies and fabric shrink

I applied reinforcement doilies to fuselage and did the final shrink. I ironed the front of the fuselage at 350 degrees. From the rear lift strut attach point aft, I stopped at 300 degrees. I could see the lower longerons near the empennage were starting to bend slightly at that temperature and decided that was adequate. I went with the higher temperature in the front of the fuselage because that area will get more prop blast.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.