KitLog pro

Powered By Kitlog Pro v2.0

Johns Web Site
' style=
Date:  9-3-2017
Number of Hours:  3.00
Manual Reference:  Ch 4.16
Brief Description:  Completed Installation of Doors

I installed the gas struts that hold the doors open. I installed 3M protective tape around the door openings to protect the fabric and paint from damage when people are getting in and out of the plane. The tape will also protect the fabric and paint from the edge of the polycarbonate plastic when the doors are closed. I fabricated strike plates from sheet stainless steel.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.