KitLog pro

Powered By Kitlog Pro v2.0

Baby Steps to an RV-8
' style=
Date:  2-14-2016
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Match Drilled Z-Brackets Right Tank

Continuing with the match drilling of the Right Tank. Finished with the Z-Brackets. Hit each one with the #30 Reamer. Thought I would have to first drill with a #31 before the Reamer, but the tapered tip allowed me to skip with that step. Just hope these Z-Brackets go back exactly like they came off.

Next trip to the shop I will dimple the tank in prep for riveting of the stiffeners.
' style=

Right Tank Z-Brackets/Baffle

Right Tank Z-Brackets/Baffle

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.