Well, this entry really covers about a month of sporadic work on the tank baffle. Major setback in my mind when I discovered a mismatch between tank and baffle. I had prepped the left tank, but the right baffly. Ugh!!!
None of that work was wasted. I just wasn't as "done" as I thought I was.
So, I'm ready to meld the two items, hopefully this coming weekend. I've already prepped all the surfaces. Just need to gather the guts to seal it up. And still must review other builders pics before I do. Starting to wonder if I should have installed inspection plates in each bay of the tank. Hmm..Maybe for the other tank.