Brief Description: Left Tank Mounting and Drilling
Only two hours logged, although I was at the airport for almost five. Spent an hour or two flying the Cherokee. Did a touch and go at Lorrain County with Joe. Then spent some time in the office.
Finally getting to work, I was able to drill and cleco the Left Tank outboard and inboard z-brackets. Removed the Leading Edge and the Fuel Tank Skin so that I can get to the remaining brackets tomorrow.
Also drilled out the Transition Plate on the Fuel Tank side with a #19 drill. I need to prime the plate and dimple the holes if I remember correctly.