Took a break today to do personal to do list, but did get a couple pieces made. Fabricated the clips and channels for the left wing aileron bellcrank mounting box. This attaches to rib #9 and needs to be completed before final assembly of the ribs to the spars.
Also spent some time mounting my new vise to the workbench. I added an OSB doubler on the top and bottom of the bench top bolted through all three pieces with 1/2" bolts. Very secure.