Powered By Kitlog Pro v2.0
Jeff Mitchell's RV8 project
RV-8
Firewall Forward
11-16-2013
< Previous Log Entry
Next Log Entry >
Date:
11-16-2013
Number of Hours:
2.00
Manual Reference:
N/A
Brief Description:
Amp meter shunt fusible links.
I completed the wiring to the amp meter shunt by installing insulated fusible links just in front of the terminal connections to it.
Fusible links installed
Shunt connections complete
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
1018
4065
Ailerons
25
84
Avionics
64
344
Empennage
118
324
Engine
4
17
Firewall Forward
61
308
Flaps
11
51
Fuel Tanks
54
190
Fuselage
457
1889
Misc Pics
6
4
Miscellaneous
26
215
Pics of me building
6
4
Prop
2
11
Tools
12
10
Training Kits
8
24
Wings
153
557
Workshop Setup
11
33
Copyright © 2001-2024 Matronics. All Rights Reserved.