KitLog pro

Powered By Kitlog Pro v2.0

Jeff Mitchell's RV8 project
' style=
Date:  7-16-2012
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Final Engine Installation, mixture bracket etc.

With the help of a couple hangar buddies we reinstalled the engine and got to work on some firewall forward items. The mixture control bell-crank assembly was installed and the firewall holes enlarged to accept some spherical steel cable penetrations I will install soon.
' style=

Engine installed for good!

Engine installed for good!

' style=

Mixture control belcrank

Mixture control belcrank

' style=

Engine cable penetrations

Engine cable penetrations

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.