Brief Description: Final Engine Installation, mixture bracket etc.
With the help of a couple hangar buddies we reinstalled the engine and got to work on some firewall forward items. The mixture control bell-crank assembly was installed and the firewall holes enlarged to accept some spherical steel cable penetrations I will install soon.