KitLog pro

Powered By Kitlog Pro v2.0

Jeff Mitchell's RV8 project
' style=
Date:  1-13-2013
Number of Hours:  5.00
Manual Reference:  N/A
Brief Description:  Various tasks prior to top skin riveting.

I worked on various tasks in preparation for riveting the front forward skin. Tasks like cotter pin installation, safety wire and final torque settings on various bolts and finished off with fabricating a support bracket for the cabin heat Scat tube. All things that will prove difficult when the top forward skin in riveted in place.
' style=

Scat tube bracket

Scat tube bracket

' style=

Scat tube routing

Scat tube routing

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.