KitLog pro

Powered By Kitlog Pro v2.0

Jeff Mitchell's RV8 project
' style=
Date:  5-26-2009
Number of Hours:  3.00
Manual Reference:  8-7, 8-10
Brief Description:  Riveted Firewall to floor.

Al was over today to help with some riveting. I mixed a small batch of Tank Sealant (as per the instructions) and applied it to the center / cooling ramp area of the lower edge of the firewall. Then we set the 6 rivets per side to secure the firewall to the forward floor assembly. Then I continued with work on the center section which entailed some match drilling, and machine countersinking parts for a half dozen platenuts.
' style=

Applying Tank Sealant

Applying Tank Sealant

' style=

Applying Tank Sealant

Applying Tank Sealant

' style=

Firewall riveted to floor

Firewall riveted to floor

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.