KitLog pro

Powered By Kitlog Pro v2.0

Jeff Mitchell's RV8 project
< Previous Log Entry          Next Log Entry >
' style=
Date:  10-5-2007
Number of Hours:  4.60
Manual Reference:  N/A
Brief Description:  Built storage crate for the VS / Rudder assembly.

I made a shipping crate for the Vertical Stabilizer and Rudder assembly. I used peg board on the front and 1/4" plywood on the back. I wanted the crate to breathe with the room as I always run a dehumidifier in my shop to maintain a relatively low humidity level. I also plan on using some peg board hooks to hang up tools and supplies making better use of this otherwise wasted wall space.

I also built a simple rolling dolly that I can easily position under the crate by tipping it onto one corner then positioning the wheels under the center with my foot. Then I can roll it out of the way.
' style=

Ready for the peg board front panel

Ready for the peg board front panel

' style=

All closed up

All closed up

' style=

Ready to hang some hooks

Ready to hang some hooks

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.