I am starting to gather what I need to build the support stand for the wings. I began with priming and painting the main 4X4 vertical posts and the other wooden bits I plan on using. While I had the paint out, I thought I would give the old work table a once over. (Now it's too pretty to work on). I also received a small order from Cleaveland Tools. Along with3 more small scotch bright wheels (deburring the inside holes in all those wing ribs destroys these things) I got my nice power coated red tie down rings. [Cleaveland Item Number: RVTR1, $4.00 each.]