KitLog pro

Powered By Kitlog Pro v2.0

Jeff Mitchell's RV8 project
< Previous Log Entry          Next Log Entry >
' style=
Date:  10-27-2006
Number of Hours:  3.00
Manual Reference:  None
Brief Description:  Completed air compressor setup

Completed the setup for air compressor. Installed In-Line air filter, manifold, pressure regulator and two hose lines. Plumbed them to outlets in the ceiling above my main work bench. 1 line is set at 90 PSI for the air drill and the second is adustable for the rivet gun.The box interior is lined with acoustic ceiling tiles and the box is vented with an $19.00 bathroom fan.
' style=

Completed enclosure

Completed enclosure

' style=

Ventalation fan

Ventalation fan

' style=

Completed setup

Completed setup

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.