KitLog pro

Powered By Kitlog Pro v2.0

Jeff Mitchell's RV8 project
' style=
Date:  12-8-2009
Number of Hours:  0.10
Manual Reference:  N?A
Brief Description:  Gear leg and empenage fairings arrived.

Today I received my shipment from Fairings Etc. I got the top and bottom fairings for my Grove airfoiled gear legs and the empenage fairing. They look great and should save me alot of time.
' style=

Farings Etc.

Farings Etc.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.