I had to drill new holes at the bottom of the landing gear boxes for the brake lines so I will be able to tie them into the Grove Landing gear. I think the top fittings on the grove gear should actually be placed on the forward edge at the factory instead of the aft edge. This would allow me to use the stock exit hole locations. No biggie. See image 3 for planned routing. I don't remember where I found this image so I'm unable to give credit to its builder, but thanks whoever you are! I also spent some time with the short 3/8" fuel line that will go from the fuel pump assembly to the firewall.