Brief Description: Match drilled F-804 center section to bottom skins
Sean was over to help me reposition the fuselage so I could gain access to the rivet holes common between the F-804 center section and the mid bottom skins. I also employed the use of Herc straps to (as suggested in the plans) to position the top flanges of the landing gear boxes for match drilling to the top web of the upper longerons.