I riveted the 4 vertical bulkheads to the center section. I was able to squeeze about half of them and used the gun and Tungsten bar to set the others. Don’t forget the two flush rivets. I used the back rivet set up to install the F-804G-1 vertical bars. Tomorrow I will continue by riveting on the other aft floor support angle and the two seat ramp supports.