KitLog pro

Powered By Kitlog Pro v2.0

Jeff Mitchell's RV8 project
' style=
Date:  3-26-2009
Number of Hours:  3.50
Manual Reference:  7-11
Brief Description:  Final flap fabrication.

I match drilled the F-706 A and B brackets on both left and right flaps. I clecoed everything together for the last time to check all steps were completed then disassembled all in preparation for cleaning and priming.
' style=

F-706 and flap inboard rib

F-706 and flap inboard rib

' style=

Flaps ready for priming

Flaps ready for priming

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.