Brief Description: Drilled left wing fuel tank Z-Brackets and primed.
Using the method outlined by Dan Chekoway at: (http://www.rvproject.com/20020605.html) I clecoed the right wing fuel tank Z-Brackets in place and back drilled them from the bottom of the spar. I prepared all 14 brackets and the nut plates for priming then gave them a good coat of SW988 Self Etching primer. Tomorrow I will rivet the nutplates onto the brackets.