KitLog pro

Powered By Kitlog Pro v2.0

Jeff Mitchell's RV8 project
' style=
Date:  8-12-2008
Number of Hours:  5.20
Manual Reference:  7-5
Brief Description:  Drilled left wing fuel tank Z-Brackets and primed.

Using the method outlined by Dan Chekoway at: (http://www.rvproject.com/20020605.html) I clecoed the right wing fuel tank Z-Brackets in place and back drilled them from the bottom of the spar. I prepared all 14 brackets and the nut plates for priming then gave them a good coat of SW988 Self Etching primer. Tomorrow I will rivet the nutplates onto the brackets.
' style=

Back drilling right wing Z-Brackets

Back drilling right wing Z-Brackets

' style=

Prepared for primer

Prepared for primer

' style=

Primer installed

Primer installed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.