KitLog pro

Powered By Kitlog Pro v2.0

Jeff Mitchell's RV8 project
' style=
Date:  10-12-2014
Number of Hours:  9.00
Manual Reference:  N/A
Brief Description:  Various first flight preparations.

Armed with my C of A, I was faced with countless little items needing attention to get this thing ready for its first flight. I secured the aft empennage fairing, updated my GPS database, trouble-shooted my Dynon OAT issue (still haven't solved it) and finished some final baffle to silicone baffle material sealing work. I also had the fuel truck over to top off the tanks 2 gallons at a time so I could calibrate the fuel quantity floats to the Dynon EMS120.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.