KitLog pro

Powered By Kitlog Pro v2.0

Jeff Mitchell's RV8 project
' style=
Date:  2-9-2014
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Pitch Servo Bellcrank.

I installed the pitch servo and the horizontal stabilizer pushrod bell crank assembly. I used castellated nuts and cotter pins at all points that have rotating points.
' style=

Pitch servo and bellcrank

Pitch servo and bellcrank

' style=

Servo bolts safety wired

Servo bolts safety wired

' style=

Castellated nuts / cotter pins

Castellated nuts / cotter pins

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.