KitLog pro

Powered By Kitlog Pro v2.0

Jeff Mitchell's RV8 project
' style=
Date:  2-1-2014
Number of Hours:  31.00
Manual Reference:  Various
Brief Description:  Various entries.

This is a bulk entry from 04 Dec 2013 to 01 Feb 2014. I accomplished the following tasks;
-Repositioned the oil cooler outboard a bit to provide more clearance from the motor mount
-Installed various connectors to the wires exiting the fuselage
-Installed connectors to the pitch and roll servos
-Installed various Adel clamps in the fuselage floor to secure wire bundles
-Planned and ordered Aerquip 303 hoses for the oil cooler
-Routed wire for a flap position switch
-Reconfigured the DSAB network to include two autopilot servos
-Installed cockpit switch labels
' style=

Fuselage to wing connections

Fuselage to wing connections

' style=

Fuse wires secured

Fuse wires secured

' style=

Autopilot servo connections

Autopilot servo connections

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.