KitLog pro

Powered By Kitlog Pro v2.0

Jeff Mitchell's RV8 project
' style=
Date:  9-25-2010
Number of Hours:  3.50
Manual Reference:  10-1
Brief Description:  Engine mount - Part 3.

I filed away the excess material in the engine mount holes and used a step drill to prepare the hole for a 3/8" bit. Then I temporarily installed the engine mount with undersized bolts and used the mount as a drill bushing to finish the each hole to a final 3/8" hole. The holes ended up clean and aligned perfectly with the mount.
' style=

Filed and step drilled

Filed and step drilled

' style=

Final size of 3/8

Final size of 3/8" drilled

' style=

Engine mount installed

Engine mount installed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.