KitLog pro

Powered By Kitlog Pro v2.0

Johns Web Site
' style=
Date:  11-22-2014
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Install of battery door

Finished with battery door. Riveting was not the best and made some mistakes(which will not happen on the outside fuselage!) I added plastic edging around the opening to make a look nice and to hide the uneven cutting of the hole (never said I was perfect). I will remove it before painting the floorboard.
' style=

Riveting of battery door

Riveting of battery door

' style=

Finished riveting

Finished riveting

' style=

Plastic edging added

Plastic edging added

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.