Removed plastic from HS front spar doubler and front spars. Match drilled doubler to spars. Clecoed attach angles to front spars and clamped bottoms of angles to a level for a straight edge. Waiting for a new drill bit to drill remaining holes for attach angles in the spars. The holes in the attach angles were initially drilled to 1/8. Will drill holes in spar using the angles holes as guides, to 1/8, and then ream assembly to #30.