Powered By Kitlog Pro v2.0
Jims Web Site
RV-9
Fuselage
9-11-2009
< Previous Log Entry
Next Log Entry >
Date:
9-11-2009
Number of Hours:
1.00
Manual Reference:
Brief Description:
Finish the flap bearings
Drilled the other hole this morning. I used the flap rod to make sure that the distance would be correct between the bearings. I hope that the bulkhead doesn't change too much when installed in the fuselage. The flap rod moves very nicely.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Remodel Home
RV-9 Home
Category
# Logs
# Hours
All
465
1371
1 Shop Work Area
2
40
2 Empennage
63
217
Electrical/Wiring
2
8
Empennage
63
217
Fuselage
170
464
Shop Work Area
2
40
Tools
1
6
Wings
162
379
Copyright © 2001-2024 Matronics. All Rights Reserved.