Powered By Kitlog Pro v2.0
Jims Web Site
RV-9
All
2-13-2008
< Previous Log Entry
Next Log Entry >
Date:
2-13-2008
Number of Hours:
2.00
Manual Reference:
Brief Description:
Assemble left elevator
Got out the left elevator parts. I had previously preped most of the parts when I did the right elevator. Assemble the left elevator spar, ribs, skin, counterbalance assy for match drilling.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Remodel Home
RV-9 Home
Category
# Logs
# Hours
All
465
1371
1 Shop Work Area
2
40
2 Empennage
63
217
Electrical/Wiring
2
8
Empennage
63
217
Fuselage
170
464
Shop Work Area
2
40
Tools
1
6
Wings
162
379
Copyright © 2001-2024 Matronics. All Rights Reserved.