KitLog pro

Powered By Kitlog Pro v2.0

Jims Web Site
' style=
Date:  9-12-2010
Number of Hours:  0.00
Manual Reference:  
Brief Description:  Move fuselage

On this beautiful Sunday morning I loaded the fuselage onto my trailer and moved the fuselage to the airport. It will reside in the CAP hangar for the next few months. My plan is to use the larger open space to assemble the wings and tail. I feel like I have built everything so far inside of a matchbox. My basement area was very cramped and I could build only one wing at a time. The fuselage was built in the garage space I was able to negotiate from my wife. Less than half of the garage was available. Now I can spread everything out and assemble both wings and the tail.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.