RV-9a
Empennage
1-13-2006
< Previous Log Entry
Next Log Entry >
Date:
1-13-2006
Number of Hours:
14.00
Manual Reference:
P 6-7
Brief Description:
finish up the Right Elevator
The Fraime was constructed, starting from the frame and finishing with adjusting the trailing edge. The frame was build. The stiffeners were backrivited on and the small wedge metal strip was added.
Starting the frame
Getting the trailing edge strate
Adjusting the elevator