Date:  2-10-2010
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Completed Acceptance test.

Completed the Acceptance test today. Found a small air leak while checking the pitot system. Replaced the hose fitting behind Spinner and it fix the leak. Airspeed system checked ok. Also completed the static vent system for leaks and all checked ok.

Aircraft is ready for our DAR inspection. Just waiting for FAA paperwork to come back so we can schedule the inspection.

Total construction time is: 779.8 hours.
' style=

Checking airspeed system for leaks.

Checking airspeed system for leaks.

' style=

Ben and Jack Ryan helped with system checks.

Ben and Jack Ryan helped with system checks.